Skip to content

HARK Mladost - rugby in Zagreb since 1954

HARK Mladost crest Croatian Academic Rugby ClubMladostZagreb, since 1954

All news

"The fight for a ground: the Croatian champions still without a permanent pitch"

Krtičnjak, the Mladost Sports Park and the proposed site in Blato on an aerial image (Esri World Imagery)
Krtičnjak, the Mladost Sports Park and the proposed site in Blato on an aerial image (Esri World Imagery)

Zagreb, 17 November 2026. We have opened a new page on the club website, "The fight for a ground". Using documents and aerial images, it tells how in 1985 Mladost lost its pitch in the Mladost Sports Park on the Sava because of construction for the Universiade, how in 1987, through an agreement with what was then the Faculty of Physical Culture, it was given a replacement ground, and how a solution with the pitch, changing rooms and clubhouse in one place is still being sought today.

The oldest rugby club in Croatia first played on the Sava for 31 years. For three years it played on a temporary pitch, and since 1988 it has played at Krtičnjak, on the land of the Faculty of Kinesiology, with no changing rooms by the pitch. Between 2018 and 2020 the proposal for Blato went furthest: the city offices for sport and for strategic planning gave positive opinions, a conceptual design was prepared, and after receiving the Croatian champions in 2020 the mayor concluded that the matter should be acted on urgently. The ground was not built.

On 5 November 2026 the Government of the Republic of Croatia gave its support to the National Centre for the Development of Water Sports on the grounds of the Faculty of Kinesiology, and today the Government, through two ministries, signed an agreement on implementing it with the University of Zagreb and the faculty. This also sets the timeframe: design in 2027, construction in 2028. The club supports the project, but there is no rugby pitch in the published image of the centre. If it stays that way, Mladost, the reigning Croatian champions in rugby union (15s), will this time be left without a ground.

What was signed and when it will be built

The Agreement on cooperation and on establishing the framework for implementing infrastructure projects on the grounds of the Faculty of Kinesiology was signed at the National and University Library by the Minister of Tourism and Sport Tonči Glavina, the Minister of Science, Education and Youth Radovan Fuchs, the Rector of the University of Zagreb Stjepan Lakušić and the Dean of the Faculty of Kinesiology Tomislav Rupčić, in the presence of Prime Minister Andrej Plenković. The agreement is a framework for preparing the project, not a construction contract.

According to media reports, the project is worth 137.5 million euros and includes:

  • the National Centre for the Development of Water Sports with an Olympic pool, a diving pool, a warm-up pool and stands for about 5,000 spectators,
  • the renovation and extension of the Faculty of Kinesiology buildings,
  • a sports hall and outdoor sports pitches,
  • accommodation pavilions for students and athletes,
  • transport and utility infrastructure with an underground car park and access roads.

The faculty's plot covers 144,102 m², between Selska cesta and Horvaćanska cesta. According to the announcements made at the signing, the design documentation will be prepared in 2027, and construction will begin in 2028, once the building permits have been obtained.

Rugby is not mentioned either in the Government's conclusion or in the reports on the signing. Where the hall and the outdoor pitches will go will be decided while the design documentation is being prepared, so 2027 is the year that will determine whether there is room for rugby in the project.

The fight for a ground: the full story with documents

PUPMP
🏆🏆🏆🏆